The 2013 fall climbing season in the Himalaya just seems to keep on going, despite the fact we keep wanting to declare it finished. Heavy snow across the region has made it a difficult year, particularly in the latter stages. But a few teams are still plugging away and holding out hope for late season summits.
Perhaps the most surprising expedition that is still on going is the Korean team's attempt to climb Lhotse. ExWeb is reporting today that the squad is still on the mountain and has launched their summit bid at last. The team moved up to Camp 3 today and are expected to go to C4 tomorrow with the push to the top to follow shortly thereafter. The report says that the Korean climbers attempted to shuttle gear to Camp 4 a few days back but were turned away by excessive snow. If that is the case, I would expect the upper slopes to be very difficult, making the way to the summit a real challenge. If all goes according to plan, it looks like they'll make the final push this weekend. Lets hope it is a safe climb up and back down.
ExWeb is also reporting news from several expeditions to smaller mountains in Nepal as well. A French team is attempting the 7031 meter (23,067 ft) Saipal in the western party of the country, while another French squad has wrapped up a new route on Gauri Shankar, a 7314 meter (23,996 ft) peak on the border of Tibet. British climbers Mick Fowler and Paul Ramsden were also able to make the first ascent of Kishtwar Kailash a few weeks back. You can read details of their ascent of that 6451 meter (21,164 ft) mountain by clicking here.
Finally, we're all still awaiting word from Chad Kellogg and David Gottlieb on their attempt to make a first ascent of Lunag-Ri. It has been ten days since we received the last dispatch and at that time the boys were prepping for a summit push that was to begin on October 25 and should have taken roughly 4-5 days to complete. Given that they expected quite a bit of snow up near the summit, it is possible they are still working the route or making their descent. Hopefully we'll get news from them soon. At 6895 meters (22,621 ft) it is the tallest unclimbed peak in Nepal. Chad and David aren't the only ones attempting the mountain this fall either. There was another team in BC that was a day or two ahead of them in acclimatization and launching their own summit bid.
That's it for now. Hopefully we'll hear more about these last few expeditions in the next day or two. It seems the season will truly wrap up in the next week or so.
Showing posts with label Lunag Ri. Show all posts
Himalaya Fall 2013: Snow Delays Climb On Lunag-Ri
As mentioned previously in my updates on the fall climbing season in the Himalaya, things are definitely winding down across the region. The majority of the expeditions have returned home although a few are still there and attempting to make summit bids on various mountains. Heavy snows are not making it easy however as teams continue to dig out from the massive cyclone that dumped impressive amounts of powder on the mountains last week.
Chad Kellogg and David Gottlieb have checked in from Lunag-Ri, the target of their efforts this fall. As you may recall, the mountain holds the distinction of being the tallest unclimbed peak in Nepal with an altitude of 6895 meter (22,621 ft). When last we heard from the boys, they were on there way to Base Camp after just setting out from Namche Bazaar. The trek to BC was relatively uneventful and duo arrived on the mountain where they were greeted by two other climbers hoping to make the first ascent of Lunag-Ri as well. That team had already established Advanced Base Camp further up the slope and were in the process of wrapping up their acclimatization efforts.
All of this happened early last week before the cyclone made landfall, bringing heavy snows along with it. The forecast indicated that the storm could dump fresh powder on the Himalaya for several days, so Chad, David and their companions all settled into their tents to wait. Before long, a full fledged blizzard was hitting the mountain, burying everything in sight, including the tents they were staying in. It was an uphill battle keeping them from collapsing under the weight, but they managed to make it through relatively unscathed. By the time the snow stopped falling it had deposited 4 feet (1.2 meters) on the ground, which has made things difficult to say the least.
Over the weekend the team started shuttling gear up the mountain towards ABC. They made a cache halfway to that point and plan on going all the way up today. They'll build their campsite there, then drop down to fetch the cache tomorrow. After that, it'll be back to BC for a brief rest and then they'll launch their attempt on the summit. Chad estimates that it will take them roughly four days to make the climb. That ascent could start late this week.
It sounds like conditions will be tough all the way to the top, as the boys will be forced to break trail much of the way. They are particularly concerned about how much snow will be on the summit ridge as they approach the top, provided they even get a chance to reach that point. The weather forecast looks much improved for now however, so it seems they'll at least have a shot at topping out.
Stay tuned for updates.
Chad Kellogg and David Gottlieb have checked in from Lunag-Ri, the target of their efforts this fall. As you may recall, the mountain holds the distinction of being the tallest unclimbed peak in Nepal with an altitude of 6895 meter (22,621 ft). When last we heard from the boys, they were on there way to Base Camp after just setting out from Namche Bazaar. The trek to BC was relatively uneventful and duo arrived on the mountain where they were greeted by two other climbers hoping to make the first ascent of Lunag-Ri as well. That team had already established Advanced Base Camp further up the slope and were in the process of wrapping up their acclimatization efforts.
All of this happened early last week before the cyclone made landfall, bringing heavy snows along with it. The forecast indicated that the storm could dump fresh powder on the Himalaya for several days, so Chad, David and their companions all settled into their tents to wait. Before long, a full fledged blizzard was hitting the mountain, burying everything in sight, including the tents they were staying in. It was an uphill battle keeping them from collapsing under the weight, but they managed to make it through relatively unscathed. By the time the snow stopped falling it had deposited 4 feet (1.2 meters) on the ground, which has made things difficult to say the least.
Over the weekend the team started shuttling gear up the mountain towards ABC. They made a cache halfway to that point and plan on going all the way up today. They'll build their campsite there, then drop down to fetch the cache tomorrow. After that, it'll be back to BC for a brief rest and then they'll launch their attempt on the summit. Chad estimates that it will take them roughly four days to make the climb. That ascent could start late this week.
It sounds like conditions will be tough all the way to the top, as the boys will be forced to break trail much of the way. They are particularly concerned about how much snow will be on the summit ridge as they approach the top, provided they even get a chance to reach that point. The weather forecast looks much improved for now however, so it seems they'll at least have a shot at topping out.
Stay tuned for updates.
Subscribe to:
Posts (Atom)
Follow Us
Were this world an endless plain, and by sailing eastward we could for ever reach new distances